Takaisin: ryhmä NIA13SN

ICT Network Infrastructure Project (A9065), 5 op

Toteutussuunnitelma (PDF), 2 sivua

Toteutus
NIA1411
Lukukausi
1/2014-2015
Ajankohta
25.8.2014–23.12.2014
Tyyppi
DEVELOPMENT OF CORE COMPETENCES IN THE FIELD (A030)
Ryhmä
NIA13SN
Kampus
Laurea Leppävaara
Opetuskieli
englanti
Opettajat
Koponen Seppo (Teacher in charge), Kämppi Pasi (Other teacher)
Tila
Valmis
Näytä tekstiversio
                                                                                                                       1/2
Implementation plan Finished



 Study unit                            ICT Network Infrastructure Project (A9065), 5.0
 Implementation                        NIA1411: 1/2014-2015 (25.08.2014 - 23.12.2014)
 Type                                  DEVELOPMENT OF CORE COMPETENCES IN THE FIELD (A030)
 Groups                                Primary: NIA13SN Others :
 Involved in the project
 Lecturers
 Number of participants                Minimum: Maximum:
 Enrolment period                      19.05.2014 08:00 - 02.06.2014
 Main timing for implementation
 Applicabililty                        For exchange students: Yes For elective studies: No Open UAS student:
                                       No Suitable for virtual UAS: No

 Teachers                              Koponen Seppo (Teacher in charge), Kämppi Pasi (Other teacher)
 Campus                                Laurea Leppävaara
 Main location for implementation
 Implementation method                 Optima realization/student group, Project/venture/R&D Language: English Virtuality:
                                       0 cr Integration of R&D: 5 cr
 Implementation class
 Focus areas
 Evaluation at the latest              13.01.2015 Storing of graded material ends.: 15.07.2015
 Exam days                             Real: No exam

 Having completed the study unit the   ●      formulate and justify the project aims and objectives
 student is able to                    ●      prepare and present project plan
                                       ●      participate and manage project work related to building, expanding, managing
                                              and maintaining networks, independently and in groups
                                       ●      demonstrate and deliver project results
 Previous studies                      Data Networks or equivalent knowledge
 Previous studies, more information    For Laurea students, also A9064 ICT Network Infrastructure is recommended.
 Learning objectives                   ●      According to the section "Having completed the study unit the student is able to":
                                       ●      Get self-confidence by finding a role in a project team and contributing actively
                                              to the results.
 Contents                              See Optima
 Study material                        Ojasalo, K., Moilanen, T. Ritalahti, J. 2009. Kehittämistyön menetelmät - Uudenlaista
                                       osaamista liiketoimintaan. WSOYpro, Helsinki. Translation of the essential parts of the
                                       book is in Optima workspace (in Materials) as a document "Research Oriented
                                       Approach.doc"
 Tutoring and communication            Optima workspace "A9065 ICT Network Infra Project"
 Evaluation criteria and methods       The students are evaluated and graded as a team unless their contribution is expressed
                                       explicitly, eg. in a action point register. Individual evaluation is applied in "Delivery of
                                       ideas" only. The team project is evaluated as a whole (5cr). No partial credits are issued.
                                       The total grade is given based on the following 3 evaluation targets: Evaluation criteria
                                       Evaluation target Weight Scale

                                       Systematic approach 40% 0-5

                                       Delivery of ideas 40% 0-5

                                       Reporting and documenting 20% 0-5

                                       Systematic approach: Realistic planning, following the plan, reacting to changes,

SoleOPS 3.5.5 Study offer © 2005-2016 Solenovo Oy
                                                                                                                   2/2
Implementation plan Finished



                                       punctuality, usefulness, management Delivery of ideas: Clarity in presentations and
                                       slides, minding the audience, impression, argumentation Reporting and documenting:
                                       Logical format, structure and content of the project plan and final report
 Project (name)                        Students are encouraged to bring their own project ideas.
 R&D methods                           The students select their research methods according to their project objectives.

Learning events
 Date             o'clock/at h   Subject          Content                                       Status         Teachers
 05.09.2014       12:30      2   Introduction     RegistrationAbout project
                                 to the study     managementExamples of projects at
                                 unit             LaureaTeams
 12.09.2014       12:30     2    Project ideas    Final forming of project groups (of 3) and
                                 to practise      more about project management.
 19.09.2014       12:30     2    Project groups   The class is mandatory for those who have
                                 and topics       no group or topic yet. The others can
                                                  continue their work on the project plan
                                                  outside the class but are naturally invited
                                                  to join the discussion. Supervisors are
                                                  available for all.
 26.09.2014       12:30     2    Project plan     Workshop to complete the project plan.
                                 completion       Mandatory for all groups.
 24.10.2014       12:30     2    Progress         Mid check point presentations (no report
                                 presentation     required)
 28.11.2014       12:30     2    Final
                                 presentation